Here are some of our major projects completed FY 19 and prior: 

Police Department Phase 2 Expansion

 PD2-front view-crop

MultivistaPhoto-2018-09-18 (1)

The Police Department Building Phase 2 Expansion is a 2015 Bond Project that included a renovation and addition to the existing Police Department Building located at 911 Quest Parkway.  The building expansion is a 12,200 square feet, one story building which connects to the existing building via an enclosed corridor.  The existing building received interior renovations to create an evidentiary vehicle processing bay, modify the abandoned holding cells to accommodate additional evidence workspace, expand the women’s locker room, and create additional space for department employees on the second floor.   Additionally, on-street parking was added to Discovery Boulevard in order to provide more accessibility to the front door.

Sidewalk Gap Project Phase 4

The Sidewalk Gap Project Phase 4 continued the City's efforts to close gaps in existing sidewalk across the City. A few of the locations identified for this phase are shown below.

Arial view of Sidewalk Phase 4 Bell blvd Arial view of Sidewalk Phase 4 Cottonwood Creek Trail at Medical Parkway Arial view of Sidewalk Phase 4 Hatch Road
Bell Blvd: West side north of Whitestone Blvd Cottonwood Creek Trail at Medical Parkway Hatch Road east side north of RR620
Arial view of Sidewalk Phase 4 Iris Lane

Arial view of Sidewalk Phase 4 Giddens Elementary

Arial view of Sidewalk Phase 4 Carriage Hills

Iris Lane north of Heather Lane Giddens Elementary 2-ramps Carriage Hills Alley crossings 8-ramps

 

Milburn Park Volleyball Improvements

The improvements to the sand volleyball courts at Milburn Park included a pavilion, shade structures, bleachers, sand showers and additional sidewalk.

Milburn Park Volleyball Improvements

 

Sidewalk Gap Phase 3

This project closes gaps in the City's sidewalk system. The Sidewalk Gap Project is funded by the Community Development Corporation (4B Board).  These areas were completed in Summer 2017:

Town Center

Arial View of El Salido Sidewalk

Arial View of East Park Sidewalk

Town Center pedestrian ramps at diamond intersection of Alamo Plaza and Enchanted Rock El Salido Parkway at Heather Drive E. Park Street ramp relocation at Gadwall Lane

Buttercup CreekArial View of Buttercup Creek Sidewalk closeup

Buttercup Creek Blvd west of Bell Blvd fronting The Commons shopping center.

 

Little Elm Trail from Bell Boulevard to Lakeline Boulevard

Little Elm Ribbon Cutting-1-2

The Little Elm Trail project was completed in January.  It provides drivers an additional east-west route between Bell Boulevard (US 183) and Lakeline Boulevard. 

1431 Pass-Through Project

Ribbon Cutting - 1431-1

The City of Cedar Park, Williamson County and the Texas Department of Transportation officially “cut the ribbon” on the 1431 Pass-Through Project on Wednesday, November 16.  This transportation project, which is a partnership among the City, the County and TxDOT, is the most significant in Cedar Park history.  TxDOT is already reporting significant improvements in travel times as a result of the project.