Utilities

  1. Cottonwood Wastewater Interceptor
  • Cottonwood Wastewater InterceptorApproximately 5,300 feet of 36 inch wastewater pipe
  • Eliminates the Cottonwood Wastewater Lift Station
  • Accommodates present and future needs in the area
  • Completed in summer of 2021
  1. Elevated Water Storage Tank