Intersection Closure at Cedar Park Drive and Royal Lane expected September 11 - September 22

Traffic controls and detours will be in place.
Project Details
The project will include drainage, utility and roadway improvements within the Cedar Park Ranchettes 2 and 3 along Monarch Drive, Wooten Street, Hall Street and Royal Lane, between Cedar Park Drive and Lone Star Drive, as well as drainage and channel improvements between Cedar Park Drive and Park Street to mitigate localized flooding. Project improvements will include stormwater area inlets, drainage pipes, channel grading, utility modifications, concrete riprap, retaining walls and roadway improvements, including mill and overlay of the existing pavement and the addition of concrete ribbon curbs.
- Project Construction Contractor: Cash Construction Company, Inc.
- Currently under construction
Construction Area